ONE: Foundation Slab Completed

We have successfully completed one of the key stages in the construction of the ONE residential complex – the pouring of the foundation slab.

Project scale in numbers:
• 320 tons of reinforcement installed in the foundation structure
• 88 piles, driven to a depth of 42 meters, ensuring resistance to seismic activity of up to magnitude 8
• 48 hours of continuous concrete pouring
• 350 concrete mixer trucks involved in the process
• 2,800 cubic meters of B30-grade concrete used
• Foundation dimensions: 56 meters long and 16.5 meters wide
• Foundation height: 2.4 meters

Construction continues at the project site in the heart of Batumi. The upcoming stages include stripping the formwork and beginning the vertical structure.